{"data":{"id":"us-ia/iowa-code-572.12","jurisdiction":"us-ia","citation":"Iowa Code § 572.12","heading":"Time of filing against railway.","body":"Where a lien is claimed upon a railway, the subcontractor shall have ninety days from the last day of the month in which such labor was done or material furnished within which to file the claim therefor.","path":["Title XIV - PROPERTY (Ch. 555 - 594A)","Chapter 572 - MECHANIC’S LIEN"],"source_url":"https://www.legis.iowa.gov/docs/code/2026/572.12.pdf","current_through":"Iowa Code 2026 edition","vintage":"","retrieved_at":"2026-09-14T19:40:15Z","sha256":"74ecf81549d0aaa574ea11e22b846b36d2ef100fca068f0f84ced5f801270c1d","source_id":"us-ia","stale":false,"prev":"us-ia/iowa-code-572.11","next":"us-ia/iowa-code-572.13"},"notice":"GroundRules: Original legal text. Not legal advice."}
