{"data":{"id":"us-id/idaho-code-39-4112","jurisdiction":"us-id","citation":"Idaho Code § 39-4112","heading":"Maximum permit fees to be assessed by the division.","body":"Building permit fees shall be as established by rules promulgated by the board. Until such rules are effective, building permit fees based on total value of the construction shall not exceed those given in table 3-A, Uniform Building Code, 1985.","path":["TITLE 39 HEALTH AND SAFETY","CHAPTER 41 IDAHO BUILDING CODE ACT"],"source_url":"https://legislature.idaho.gov/statutesrules/idstat/title39/t39ch41/sect39-4112/","current_through":"2026 Legislative Session","vintage":"","retrieved_at":"2026-09-04T11:20:04Z","sha256":"70b5259d13bb64cc6177914c459705a50230ceed9f5077f399c57d1fd79c0ab7","source_id":"us-id","stale":false,"prev":"us-id/idaho-code-39-4111","next":"us-id/idaho-code-39-4113"},"notice":"GroundRules: Original legal text. Not legal advice."}
