{"data":{"id":"us-id/idaho-code-43-1902","jurisdiction":"us-id","citation":"Idaho Code § 43-1902","heading":"Method of making contract.","body":"The making of any contract under this act obligating a district to repay construction costs shall be authorized by the board of directors and the voters of the district in substantially the same manner as is provided with respect to contracts with the United States for repayment of the cost of irrigation works.","path":["TITLE 43 IRRIGATION DISTRICTS","CHAPTER 19 DOMESTIC WATER SYSTEMS — CONTRACTS WITH UNITED STATES"],"source_url":"https://legislature.idaho.gov/statutesrules/idstat/title43/t43ch19/sect43-1902/","current_through":"2026 Legislative Session","vintage":"","retrieved_at":"2026-09-04T11:21:48Z","sha256":"829acf8b0839fdc1d8afe020d1eee84e39f14a4426ce0dd22f2b460c87397626","source_id":"us-id","stale":false,"prev":"us-id/idaho-code-43-1901","next":"us-id/idaho-code-43-1903"},"notice":"GroundRules: Original legal text. Not legal advice."}
