{"data":{"id":"us-id/idaho-code-70-502","jurisdiction":"us-id","citation":"Idaho Code § 70-502","heading":"Construction commenced on approval of plans and specifications.","body":"Upon approval by the board of examiners of the plans and specifications authorized to be prepared by section 70-501, the state reclamation engineer is hereby authorized and directed to commence construction of such outlet control structure. The provisions of section 67-2304, Idaho Code, (as amended,) shall have no application to the provisions of this act.","path":["TITLE 70 WATERCOURSES AND PORT DISTRICTS","CHAPTER 5 OUTLET CONTROL STRUCTURES"],"source_url":"https://legislature.idaho.gov/statutesrules/idstat/title70/t70ch5/sect70-502/","current_through":"2026 Legislative Session","vintage":"","retrieved_at":"2026-09-04T11:24:34Z","sha256":"2bfa02691568e230a9c07f3c4a21ef42d5d92a82a5a624d675ec0d1fc9ed3fa4","source_id":"us-id","stale":false,"prev":"us-id/idaho-code-70-501","next":"us-id/idaho-code-70-503"},"notice":"GroundRules: Original legal text. Not legal advice."}
