{"data":{"id":"us-il/110-ilcs-62-35","jurisdiction":"us-il","citation":"110 ILCS 62/35","heading":"Operational and energy cost savings.","body":"The public university shall document the operational and energy cost savings specified in the guaranteed energy savings contract and designate and reserve that amount for an annual payment of the contract. If the annual energy savings are less than projected under the guaranteed energy savings contract the qualified provider shall pay the difference as provided in Section 20.","path":["CHAPTER 110 HIGHER EDUCATION","Public University Energy Conservation Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=1065\u0026ChapterID=18\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:27Z","sha256":"9c7ed8c7c031d004bb88a88de41e5ba311d9b0a92c97aa519a8805551e41be82","source_id":"us-il","stale":false,"prev":"us-il/110-ilcs-62-30","next":"us-il/110-ilcs-62-40"},"notice":"GroundRules: Original legal text. Not legal advice."}
