{"data":{"id":"us-il/20-ilcs-3110-13.1","jurisdiction":"us-il","citation":"20 ILCS 3110/13.1","heading":"","body":"No project may be carried out by the Authority unless commenced before July 1 of the third year following the year in which the project was authorized by the General Assembly. For the purposes of this Section, a project is commenced when the contract or contracts therefor have been let or revenue bonds issued thereon. Nothing in this Section prevents the re-authorization of such a project by the General Assembly.","path":["CHAPTER 20 EXECUTIVE BRANCH","Building Authority Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=363\u0026ChapterID=5\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:15Z","sha256":"55fee5f752d46e7970be721e52c028310ba8c88d545a02041c17ec34e27d1824","source_id":"us-il","stale":false,"prev":"us-il/20-ilcs-3110-13","next":"us-il/20-ilcs-3110-14"},"notice":"GroundRules: Original legal text. Not legal advice."}
