{"data":{"id":"us-il/225-ilcs-720-2.03","jurisdiction":"us-il","citation":"225 ILCS 720/2.03","heading":"Reclamation Plan.","body":"(a) Each permit application shall include a reclamation plan which meets all requirements which the Department by rule prescribes. Such rules shall as a minimum prescribe the applicable requirements for such plans set forth in the Federal Act and Regulations.\n(b) Each application for revision of a permit shall include a revised reclamation plan or a statement with supporting evidence that the proposed revision does not require a revision of the reclamation plan.","path":["CHAPTER 225 PROFESSIONS, OCCUPATIONS, AND BUSINESS OPERATIONS","Surface Coal Mining Land Conservation and Reclamation Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=1390\u0026ChapterID=24\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:32Z","sha256":"a1bd4aba2dab110ad293b12fc9426cccadb0dfeba9708faadd920e48193d9171","source_id":"us-il","stale":false,"prev":"us-il/225-ilcs-720-2.02","next":"us-il/225-ilcs-720-2.04"},"notice":"GroundRules: Original legal text. Not legal advice."}
