{"data":{"id":"us-il/30-ilcs-517-30","jurisdiction":"us-il","citation":"30 ILCS 517/30","heading":"Capital Development Board; exemption.","body":"The Capital Development Board (CDB) is exempt from the requirements of this Act with respect to a specific project if (i) CDB determines that the project is too complex for the 5 major construction building trades to identify the numerous individual procured products required for the project or (ii) CDB determines that procured products required for the project are too numerous or complex to be able to efficiently assess the sites where manufactured.","path":["CHAPTER 30 FINANCE","Procurement of Domestic Products Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=2622\u0026ChapterID=7\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:19Z","sha256":"4ef455a94f7eb13e3431e356350a8de2c7a173419719951cfcb9798c4b5ec46b","source_id":"us-il","stale":false,"prev":"us-il/30-ilcs-517-25","next":"us-il/30-ilcs-517-35"},"notice":"GroundRules: Original legal text. Not legal advice."}
