{"data":{"id":"us-il/30-ilcs-537-35","jurisdiction":"us-il","citation":"30 ILCS 537/35","heading":"Small projects.","body":"(Section scheduled to be repealed on January 1, 2030)\nIn any case where the total overall cost of the project is estimated to be less than $10 million, the State construction agency may combine the two-phase procedure for selection described in Section 30 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 30.","path":["CHAPTER 30 FINANCE","Design-Build Procurement Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=2758\u0026ChapterID=7\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:19Z","sha256":"1064ff003da9d4bba97fc91bd69b36c1eda3103c14f641c6679adea637ae2101","source_id":"us-il","stale":false,"prev":"us-il/30-ilcs-537-30","next":"us-il/30-ilcs-537-40"},"notice":"GroundRules: Original legal text. Not legal advice."}
