{"data":{"id":"us-il/30-ilcs-538-1-55","jurisdiction":"us-il","citation":"30 ILCS 538/1-55","heading":"Transition to design-bid-build.","body":"(Section scheduled to be repealed on January 1, 2028)\nAt the completion of design development, the progressive design-build entity must provide a firm fixed price. The State construction agency reserves the right to transition the project to the design-bid-build method if the fixed price exceeds the project budget, the progressive design-build entity's proposed schedule is unreasonable, or if transitioning to the design-bid-build method is in the best interests of the State.","path":["CHAPTER 30 FINANCE","Progressive Design-Build Pilot Program Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=4542\u0026ChapterID=7\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:19Z","sha256":"1cd669be517119b8331243d421ed626eb0ee839b3e36f62a726dba6012610d0f","source_id":"us-il","stale":false,"prev":"us-il/30-ilcs-538-1-50","next":"us-il/30-ilcs-538-1-60"},"notice":"GroundRules: Original legal text. Not legal advice."}
