{"data":{"id":"us-il/415-ilcs-35-7a","jurisdiction":"us-il","citation":"415 ILCS 35/7a","heading":"","body":"The Department shall issue an order compelling any pump installation contractor who is in violation of this Act or the rules and regulations promulgated hereunder to remedy the violations. The order shall specify the violations and a date by which they shall be remedied. Failure of the contractor to remedy the violations by the date specified in the order shall constitute a business offense punishable by a fine not to exceed $750, with each day subsequent to such date that the violations remain uncorrected constituting a separate offense.","path":["CHAPTER 415 ENVIRONMENTAL SAFETY","Illinois Water Well Pump Installation Code."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=1591\u0026ChapterID=36\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:36Z","sha256":"44f3de5514b619586003eb74c15ec7dfc2ac7bd9d35d5f46cdcef5d2245e8cde","source_id":"us-il","stale":false,"prev":"us-il/415-ilcs-35-6","next":"us-il/415-ilcs-35-8"},"notice":"GroundRules: Original legal text. Not legal advice."}
