{"data":{"id":"us-il/65-ilcs-5-11-135.5-65","jurisdiction":"us-il","citation":"65 ILCS 5/11-135.5-65","heading":"Small projects.","body":"In any case where the total overall cost of the project is estimated to be less than $12,000,000, the commission may combine the two-phase procedure for selection described in Section 11-135.5-60 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 11-135.5-60.","path":["CHAPTER 65 MUNICIPALITIES","Illinois Municipal Code."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=802\u0026ChapterID=14\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:23Z","sha256":"b24e044f891c1ce229d5b8c63b0eff341772c6f1405a7d16556acb30cfbf6da4","source_id":"us-il","stale":false,"prev":"us-il/65-ilcs-5-11-135.5-60","next":"us-il/65-ilcs-5-11-135.5-70"},"notice":"GroundRules: Original legal text. Not legal advice."}
