{"data":{"id":"us-il/65-ilcs-90-19","jurisdiction":"us-il","citation":"65 ILCS 90/19","heading":"","body":"Not less than 60 days prior to the date of the performance of any work other than an annual inspection or routine maintenance, a municipality shall provide notice of the following to the owner of property and the resident of the property on which the work will be performed:\n(a) a description of the deficiency which necessitates the work;\n(b) a description of the entire work to be performed;\n(c) an estimate of the length of time needed to complete the work; and\n(d) the proposed date for beginning of the work.\nThe municipality shall proceed to perform the work at the end of the 60 day notice period.","path":["CHAPTER 65 MUNICIPALITIES","Municipal Wastewater Disposal Zones Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=817\u0026ChapterID=14\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:23Z","sha256":"45b191854b848b70852f2502bab0e0be789fbcce8d1ffa19e82336316da651a3","source_id":"us-il","stale":false,"prev":"us-il/65-ilcs-90-18","next":"us-il/65-ilcs-90-20"},"notice":"GroundRules: Original legal text. Not legal advice."}
