{"data":{"id":"us-il/70-ilcs-1205-8-55","jurisdiction":"us-il","citation":"70 ILCS 1205/8-55","heading":"Small design-build projects.","body":"In any case where the total overall cost of the project is estimated to be less than $12,000,000, the park district may combine the two-phase procedure for design-build selection described in Section 8-50 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 8-50.","path":["CHAPTER 70 SPECIAL DISTRICTS","Park District Code."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=892\u0026ChapterID=15\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:24Z","sha256":"31c4b149f09e19ad9e0c3549b6c3fbe43807a157f499d2d7bfa0ef1532844857","source_id":"us-il","stale":false,"prev":"us-il/70-ilcs-1205-8-54","next":"us-il/70-ilcs-1205-8-56"},"notice":"GroundRules: Original legal text. Not legal advice."}
