{"data":{"id":"us-il/70-ilcs-1505-26.10-9","jurisdiction":"us-il","citation":"70 ILCS 1505/26.10-9","heading":"Small design-build projects.","body":"In any case where the total overall cost of the project is estimated to be less than $12,000,000, the Chicago Park District may combine the two-phase procedure for design-build selection described in Section 26.10-8 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 26.10-8.","path":["CHAPTER 70 SPECIAL DISTRICTS","Chicago Park District Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=917\u0026ChapterID=15\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:24Z","sha256":"f9ffdf360ae487589b2cb432f4528de473cb85e5f3ea28f4ebc8cb6a1699395d","source_id":"us-il","stale":false,"prev":"us-il/70-ilcs-1505-26.10-8","next":"us-il/70-ilcs-1505-26.10-10"},"notice":"GroundRules: Original legal text. Not legal advice."}
