{"data":{"id":"us-il/70-ilcs-860-30","jurisdiction":"us-il","citation":"70 ILCS 860/30","heading":"Small projects.","body":"In any case where the total overall cost of the project is estimated to be less than $12,000,000, the forest preserve or conservation district may combine the two-phase procedure for selection described in Section 25 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 25.","path":["CHAPTER 70 SPECIAL DISTRICTS","Forest Preserve District and Conservation District Design-Build Authorization Act."],"source_url":"https://www.ilga.gov/legislation/ILCS/details?ActID=4195\u0026ChapterID=15\u0026ChapAct=FullText\u0026Print=True","current_through":"at least Public Act 104-790","vintage":"","retrieved_at":"2026-09-15T04:46:24Z","sha256":"074bf150853307d31a12ae8dbe0198d93464111ffd420cd1569e81be56990cc4","source_id":"us-il","stale":false,"prev":"us-il/70-ilcs-860-25","next":"us-il/70-ilcs-860-35"},"notice":"GroundRules: Original legal text. Not legal advice."}
