{"data":{"id":"us-in/ic-22-15-3-1-version-a","jurisdiction":"us-in","citation":"IC 22-15-3-1 (Version a)","heading":"Issuance; plan review by county or municipality; expiration","body":"Sec. 1. (a) The state building commissioner or a city, town, or county certified under subsection (d) shall issue a design release for the construction of a Class 1 structure to an applicant who qualifies under section 2 or 3 of this chapter.\n(b) The state building commissioner shall issue a design release for the fabrication of an industrial building system or mobile structure under section 4 of this chapter.\n(c) A design release issued under this chapter expires on the date specified in the rules adopted by the commission.\n(d) The commission may certify a city, town, or county as qualified to issue design releases, if the city, town, or county:\n(1) is competent under the commission's objective criteria; and\n(2) has adopted the rules of the commission under IC 22-13-2-3.\n(e) A city, town, or county that is certified by the commission under subsection (d) may issue design releases. A design release issued by a certified city, town, or county must be:\n(1) in accordance with the commission's objective criteria; and\n(2) for a construction type for which the city, town, or county is certified.\nAll records held by a certified city, town, or county that pertain to the design release must be submitted to the department to be held in a central repository.","path":["TITLE 22. LABOR AND SAFETY","ARTICLE 15. BUILDING AND EQUIPMENT LAWS: ENFORCEMENT","Chapter 3. Design Releases"],"source_url":"https://iga.in.gov/ic/2026/Title_22.html#22-15-3-1","current_through":"2026","vintage":"2026","retrieved_at":"2026-08-18T00:45:42Z","sha256":"4676ba405c84f64294e27a6275b390f0058ca10705bbf21158e88326b4c555e0","source_id":"us-in","stale":false,"prev":"us-in/ic-22-15-2-7","next":"us-in/ic-22-15-3-1-version-b"},"notice":"GroundRules: Original legal text. Not legal advice."}
