{"data":{"id":"us-in/ic-22-5-1.7-17","jurisdiction":"us-in","citation":"IC 22-5-1.7-17","heading":"Termination of contract with subcontractor for violation of chapter; action to challenge","body":"Sec. 17. (a) If a contractor determines that a subcontractor is in violation of this chapter, the contractor may terminate a contract with the subcontractor for the violation.\n(b) The termination of a contract under subsection (a) for a violation of this chapter by a subcontractor may not be considered a breach of contract by the contractor or the subcontractor.\n(c) A subcontractor may file an action with a circuit or superior court having jurisdiction in the county to challenge a termination of a contract under subsection (a) not later than twenty (20) days after the contractor terminates the contract with the subcontractor.","path":["TITLE 22. LABOR AND SAFETY","ARTICLE 5. UNLAWFUL LABOR PRACTICES","Chapter 1.7. Public Contract for Services; Business Entities; Unauthorized Aliens"],"source_url":"https://iga.in.gov/ic/2026/Title_22.html#22-5-1.7-17","current_through":"2026","vintage":"2026","retrieved_at":"2026-08-18T00:45:42Z","sha256":"966c4cd1f375665d2a7365a1fa1cbe4c097965c94ad9b13650f1531329afc001","source_id":"us-in","stale":false,"prev":"us-in/ic-22-5-1.7-16","next":"us-in/ic-22-5-3-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
