{"data":{"id":"us-in/ic-25-23.7-6-4","jurisdiction":"us-in","citation":"IC 25-23.7-6-4","heading":"Continuing education requirements","body":"Sec. 4. Each licensed installer must complete the continuing education required by the board before the end of each license renewal period.","path":["TITLE 25. PROFESSIONS AND OCCUPATIONS","ARTICLE 23.7. MANUFACTURED HOME INSTALLERS","Chapter 6. Renewal of License"],"source_url":"https://iga.in.gov/ic/2026/Title_25.html#25-23.7-6-4","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-06T20:43:28Z","sha256":"a68ae70c73298ce16061966c3602831772054db34738e40cb4c7e9b056969abb","source_id":"us-in","stale":false,"prev":"us-in/ic-25-23.7-6-3","next":"us-in/ic-25-23.7-6-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
