{"data":{"id":"us-in/ic-25-39-4-5","jurisdiction":"us-in","citation":"IC 25-39-4-5","heading":"Annular space grouting","body":"Sec. 5. A well that is drilled after December 31, 1987, and equipped with casing must have the annular space grouted with neat cement, bentonite clay, or another material that has been approved by the commission by the driller when the well is completed.","path":["TITLE 25. PROFESSIONS AND OCCUPATIONS","ARTICLE 39. WATER WELL DRILLING CONTRACTORS","Chapter 4. Regulation of Water Well Drilling"],"source_url":"https://iga.in.gov/ic/2026/Title_25.html#25-39-4-5","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-06T20:43:28Z","sha256":"f24b43df1f36846424ef1dad11dce0b3d38e4667ec6ae92811bedd8b330e6c27","source_id":"us-in","stale":false,"prev":"us-in/ic-25-39-4-4","next":"us-in/ic-25-39-4-6"},"notice":"GroundRules: Original legal text. Not legal advice."}
