{"data":{"id":"us-in/ic-4-13.6-5-12","jurisdiction":"us-in","citation":"IC 4-13.6-5-12","heading":"Trench safety systems; cost recovery","body":"Sec. 12. (a) This section applies to a public works project that may require creation of a trench of at least five (5) feet in depth.\n(b) IOSHA regulations 29 C.F.R. 1926, Subpart P, for trench safety systems shall be incorporated into the contract documents for a public works project.\n(c) The contract documents for a public works project shall provide that the cost for trench safety systems shall be paid for:\n(1) as a separate pay item; or\n(2) in the pay item of the principal work with which the safety systems are associated.","path":["TITLE 4. STATE OFFICES AND ADMINISTRATION","ARTICLE 13.6. STATE PUBLIC WORKS","Chapter 5. Bidding Requirements"],"source_url":"https://iga.in.gov/ic/2026/Title_4.html#4-13.6-5-12","current_through":"2026","vintage":"2026","retrieved_at":"2026-08-30T06:26:00Z","sha256":"397640e1a5cc343dcdde24e6179679ad357da273434e8be59a926539ced02d8a","source_id":"us-in","stale":false,"prev":"us-in/ic-4-13.6-5-11","next":"us-in/ic-4-13.6-6-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
