{"data":{"id":"us-in/ic-5-16-13-11","jurisdiction":"us-in","citation":"IC 5-16-13-11","heading":"Contractor compliance with certain statutes; additional requirements for contractors","body":"Sec. 11. Except as provided in this section, the following apply to each contractor in any contractor tier of a public works project:\n(1) IC 22-5-1.7. A contractor shall submit to the public agency letting the contract for a public works project, before an individual who is required to be verified under IC 22-5-1.7 begins work on the public works project, the E-Verify case verification number for the individual. An individual who is required to be verified under IC 22-5-1.7 whose final case result is final nonconfirmation may not be employed on the public works project.\n(2) A contractor may not pay cash to any individual employed by the contractor for work done by the individual on the public works project.\n(3) A contractor must be in compliance with the federal Fair Labor Standards Act of 1938, as amended (29 U.S.C. 201-209) and IC 22-2-2-1 through IC 22-2-2-8.\n(4) A contractor must be in compliance with IC 22-3-5-1 and IC 22-3-7-34.\n(5) A contractor must be in compliance with IC 22-4-1 through IC 22-4-39.5.\n(6) A contractor must be in compliance with IC 4-13-18-1 through IC 4-13-18-7.\n(7) A contractor must comply with section 12 of this chapter, if applicable.","path":["TITLE 5. STATE AND LOCAL ADMINISTRATION","ARTICLE 16. PUBLIC WORKS","Chapter 13. Requirements for Contractors on Public Works Projects"],"source_url":"https://iga.in.gov/ic/2026/Title_5.html#5-16-13-11","current_through":"2026","vintage":"2026","retrieved_at":"2026-09-02T16:11:39Z","sha256":"2c963b8474f7545114db18bd2a3f3ec9dd119bddfb52a1a07f571373c661757a","source_id":"us-in","stale":false,"prev":"us-in/ic-5-16-13-10","next":"us-in/ic-5-16-13-12"},"notice":"GroundRules: Original legal text. Not legal advice."}
