{"data":{"id":"us-in/ic-5-30-5-1","jurisdiction":"us-in","citation":"IC 5-30-5-1","heading":"Publication of notice","body":"Sec. 1. (a) Except as provided in subsection (c), when design-build contracting is used for a public project, a public agency shall publish a notice of a request for qualifications under IC 5-3-1. The notice must allow at least fourteen (14) days for potential design-builders to respond to the request for qualifications.\n(b) Subsection (c) applies to a public project for which a public agency uses design-build contracting if:\n(1) the public agency is a state educational institution; or\n(2) the public agency is not a state educational institution and the preliminary estimated cost of the public project does not exceed five million dollars ($5,000,000).\n(c) A public agency that undertakes a public project to which this subsection applies may publish a notice of a combined request for qualifications and proposals under IC 5-3-1 that includes:\n(1) the information otherwise required by this chapter; and\n(2) a request for proposals as otherwise provided under IC 5-30-6.\nThe notice must allow at least thirty (30) days for potential design-builders to respond to the combined request for qualifications and proposals.","path":["TITLE 5. STATE AND LOCAL ADMINISTRATION","ARTICLE 30. DESIGN-BUILD PUBLIC WORKS PROJECTS","Chapter 5. Request for Qualifications"],"source_url":"https://iga.in.gov/ic/2026/Title_5.html#5-30-5-1","current_through":"2026","vintage":"2026","retrieved_at":"2026-09-02T16:11:39Z","sha256":"da9b56e0e4ef18a217c2a67e4b1e8482e38c65b18ebf13ea444f2171806b0647","source_id":"us-in","stale":false,"prev":"us-in/ic-5-30-4-4","next":"us-in/ic-5-30-5-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
