{"data":{"id":"us-in/ic-5-30-7-9","jurisdiction":"us-in","citation":"IC 5-30-7-9","heading":"Ownership of drawings, specifications, and information","body":"Sec. 9. (a) Unless and until a proposal is accepted, the drawings, specifications, and other information in the proposal are the property of the offeror.\n(b) After a proposal is accepted, ownership of the drawings, specifications, and information in the drawings and specifications shall be determined under Indiana law and the terms of the design-build contract.","path":["TITLE 5. STATE AND LOCAL ADMINISTRATION","ARTICLE 30. DESIGN-BUILD PUBLIC WORKS PROJECTS","Chapter 7. Selection and Award"],"source_url":"https://iga.in.gov/ic/2026/Title_5.html#5-30-7-9","current_through":"2026","vintage":"2026","retrieved_at":"2026-09-02T16:11:39Z","sha256":"e1211c1fdd8fcb6d7bd4148028b88cd2009ce5011c24e74ca2a244b543688c9d","source_id":"us-in","stale":false,"prev":"us-in/ic-5-30-7-8","next":"us-in/ic-5-30-8-0.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
