{"data":{"id":"us-in/ic-5-30-8-1","jurisdiction":"us-in","citation":"IC 5-30-8-1","heading":"Changes in public project; validity of design-build contract","body":"Sec. 1. A design-build contract may be conditional upon subsequent refinements in scope and price and may permit the public agency to make changes in the scope of the project without invalidating the design-build contract.","path":["TITLE 5. STATE AND LOCAL ADMINISTRATION","ARTICLE 30. DESIGN-BUILD PUBLIC WORKS PROJECTS","Chapter 8. Miscellaneous Provisions"],"source_url":"https://iga.in.gov/ic/2026/Title_5.html#5-30-8-1","current_through":"2026","vintage":"2026","retrieved_at":"2026-09-02T16:11:39Z","sha256":"7622d771f09027a6026411fb4a73b086f5386b7053cd4c3c6bd0c617cd87bcfb","source_id":"us-in","stale":false,"prev":"us-in/ic-5-30-8-0.1","next":"us-in/ic-5-30-8-2"},"notice":"GroundRules: Original legal text. Not legal advice."}