{"data":{"id":"us-in/ic-5-30-8-3","jurisdiction":"us-in","citation":"IC 5-30-8-3","heading":"Adjustment of maximum cost by agreement","body":"Sec. 3. After award under this article, the maximum cost established in the successful proposal may be adjusted by negotiated agreement between the public agency and the design-builder to reflect modifications in the proposed design-build project.","path":["TITLE 5. STATE AND LOCAL ADMINISTRATION","ARTICLE 30. DESIGN-BUILD PUBLIC WORKS PROJECTS","Chapter 8. Miscellaneous Provisions"],"source_url":"https://iga.in.gov/ic/2026/Title_5.html#5-30-8-3","current_through":"2026","vintage":"2026","retrieved_at":"2026-09-02T16:11:39Z","sha256":"2abe1c5f8e4ab57680a711604946e953354066ef2e9f4b6cd2c8f252ef04473c","source_id":"us-in","stale":false,"prev":"us-in/ic-5-30-8-2","next":"us-in/ic-5-30-8-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
