{"data":{"id":"us-in/ic-8-1-31.7-19","jurisdiction":"us-in","citation":"IC 8-1-31.7-19","heading":"Resetting of adjustment rider after increase in basic rates and charges","body":"Sec. 19. An eligible utility's adjustment rider approved under sections 12 and 18 of this chapter shall be reset to zero (0) upon approval of new basic rates and charges for the eligible utility by the commission in a general rate case in which the eligible service additions are included in the eligible utility's rate base.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 31.7. Service Enhancement Improvement Projects for Water and Wastewater Utilities"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-31.7-19","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"67768f69b80d035e4506156af3cc6cb6a2c18e46e665154821fc268b9f9e14c0","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-31.7-18","next":"us-in/ic-8-1-31.7-20"},"notice":"GroundRules: Original legal text. Not legal advice."}
