{"data":{"id":"us-in/ic-8-1-39-15","jurisdiction":"us-in","citation":"IC 8-1-39-15","heading":"Revised rate schedule following general increase in rates and charges","body":"Sec. 15. A public utility that has implemented a TDSIC under this chapter shall file revised rate schedules resetting the charge if new basic rates and charges become effective for the public utility following a commission order authorizing a general increase in rates and charges that includes in the public utility's rate base eligible transmission, distribution, and storage system improvements reflected in the TDSIC.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 39. Transmission, Distribution, and Storage System Improvement Charges and Deferrals"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-39-15","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"3ae15b848c066b086440db3e4858da14db10307a1c1cbc6631eb584dba878a0b","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-39-14","next":"us-in/ic-8-1-39-16"},"notice":"GroundRules: Original legal text. Not legal advice."}
