{"data":{"id":"us-in/ic-8-1-43-5","jurisdiction":"us-in","citation":"IC 8-1-43-5","heading":"\"Make-ready infrastructure\"","body":"Sec. 5. As used in this chapter, \"make-ready infrastructure\" means the:\n(1) structures;\n(2) machinery;\n(3) equipment;\n(4) hardware;\n(5) software;\n(6) storage batteries; and\n(7) other capital investments;\ninstalled to connect charging infrastructure to an electric utility's distribution system, including any necessary upgrades to the electric utility's distribution system.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 43. Pilot Programs for Infrastructure for Public Use Electric Vehicles"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-43-5","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"07ca6b9ea6beb14431cf761a0ce0ab03f124ba56875d5df4dae7a46cf9ea11e9","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-43-4","next":"us-in/ic-8-1-43-6"},"notice":"GroundRules: Original legal text. Not legal advice."}
