{"data":{"id":"us-in/ic-8-1-43-7","jurisdiction":"us-in","citation":"IC 8-1-43-7","heading":"\"Public use electric vehicle pilot program\"","body":"Sec. 7. As used in this chapter, \"public use electric vehicle pilot program\", or \"pilot program\", means a limited deployment of:\n(1) charging infrastructure; or\n(2) make-ready infrastructure;\nthat is designed to evaluate the feasibility and design, including the associated costs and benefits, of a larger scale deployment of such infrastructure necessary to support public use electric vehicles.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 43. Pilot Programs for Infrastructure for Public Use Electric Vehicles"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-43-7","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"3988e9af110241f110627b04be74f56158180db8cbfe7eea210e546009f324a3","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-43-6","next":"us-in/ic-8-1-43-8"},"notice":"GroundRules: Original legal text. Not legal advice."}
