{"data":{"id":"us-in/ic-8-1-46-11","jurisdiction":"us-in","citation":"IC 8-1-46-11","heading":"\"Performance incentive mechanism\"","body":"Sec. 11. As used in this chapter, \"performance incentive mechanism\", or \"PIM\", means a ratemaking mechanism that is approved by the commission and that:\n(1) links an electricity supplier's earnings to the electricity supplier's performance in targeted areas that are consistent with the provision of electric utility service with the attributes set forth in IC 8-1-2-0.6, including:\n(A) reliability;\n(B) affordability;\n(C) resiliency;\n(D) stability; and\n(E) environmental sustainability;\nas described in IC 8-1-2-0.6; and\n(2) is based on specific performance metrics against which the electricity supplier's performance is measured.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 46. Performance Based Ratemaking for Electricity Suppliers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-46-11","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"0de4049cd7fd80e9516830adbcd404a96bbbbf1d6052c0ee8bfa59f75d7afba8","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-46-10","next":"us-in/ic-8-1-46-12"},"notice":"GroundRules: Original legal text. Not legal advice."}
