{"data":{"id":"us-in/ic-8-1-46-8","jurisdiction":"us-in","citation":"IC 8-1-46-8","heading":"\"Major event day\"","body":"Sec. 8. As used in this chapter, \"major event day\", or \"MED\", means a day with respect to which an electricity supplier's daily system SAIDI exceeds a statistical threshold value that is:\n(1) calculated using the 2.5 Beta methodology developed by the Institute of Electrical and Electronics Engineers; and\n(2) based on the most recent five (5) years of relevant data for the electricity supplier;\nas defined in IEEE 1366.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 46. Performance Based Ratemaking for Electricity Suppliers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-46-8","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"3c92a2300f7319f86e63b453d466de852550217cc1d94d55f2157fb1f6088267","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-46-7","next":"us-in/ic-8-1-46-9"},"notice":"GroundRules: Original legal text. Not legal advice."}
