{"data":{"id":"us-in/ic-8-1-7.9-1","jurisdiction":"us-in","citation":"IC 8-1-7.9-1","heading":"\"Acquisition\"","body":"Sec. 1. (a) As used in this chapter, \"acquisition\" means a project or an arrangement that is undertaken:\n(1) by an energy utility to construct, purchase, lease, or otherwise acquire a generation resource; and\n(2) in accordance with an approved EGR plan.\n(b) The term includes the purchase of energy or capacity through a power purchase agreement.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 7.9. Expedited Generation Resource Plans and Large Load Customers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-7.9-1","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"5edddb5fdc714860c19d18cf14d9b57167e3be72becc2e47e980f83e416a9f40","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-7-1","next":"us-in/ic-8-1-7.9-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
