{"data":{"id":"us-in/ic-8-1-7.9-12","jurisdiction":"us-in","citation":"IC 8-1-7.9-12","heading":"\"Planning costs\"","body":"Sec. 12. (a) As used in this chapter, \"planning costs\" means costs:\n(1) incurred or to be incurred by an energy utility before the issuance of an order by the commission under this chapter; and\n(2) related to an acquisition or project.\n(b) The term includes study, analysis, pre-engineering, engineering, legal, financing, and regulatory costs.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 7.9. Expedited Generation Resource Plans and Large Load Customers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-7.9-12","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"118bbf72a7edf3bb917aca472b2524936791d694e31672fccc1e60654007c759","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-7.9-11","next":"us-in/ic-8-1-7.9-13"},"notice":"GroundRules: Original legal text. Not legal advice."}
