{"data":{"id":"us-in/ic-8-1-7.9-15","jurisdiction":"us-in","citation":"IC 8-1-7.9-15","heading":"\"Project costs\"","body":"Sec. 15. As used in this chapter, \"project costs\" means the total costs of a project, including:\n(1) planning costs; and\n(2) construction and operating costs;\nrelated to the project.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 7.9. Expedited Generation Resource Plans and Large Load Customers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-7.9-15","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"9c218b8de01e422680b87624ed7d50b7905733a943ab2b5f8e245c7bc411b6cf","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-7.9-14","next":"us-in/ic-8-1-7.9-16"},"notice":"GroundRules: Original legal text. Not legal advice."}
