{"data":{"id":"us-in/ic-8-1-7.9-2","jurisdiction":"us-in","citation":"IC 8-1-7.9-2","heading":"\"Acquisition costs\"","body":"Sec. 2. As used in this chapter, \"acquisition costs\" means the total costs of an acquisition made under an EGR plan, including:\n(1) planning;\n(2) construction; and\n(3) operating;\ncosts related to the acquisition.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 7.9. Expedited Generation Resource Plans and Large Load Customers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-7.9-2","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"9f9df7a710cfc1510e07a2e11f8eeefed874281666361923bdc627f031be234a","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-7.9-1","next":"us-in/ic-8-1-7.9-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
