{"data":{"id":"us-in/ic-8-1-7.9-8","jurisdiction":"us-in","citation":"IC 8-1-7.9-8","heading":"\"Expedited generation resource plan\"","body":"Sec. 8. As used in this chapter, \"expedited generation resource plan\", or \"EGR plan\", means a plan developed by an energy utility for acquiring generation resources to meet load growth that exceeds the lesser of:\n(1) five percent (5%) of the energy utility's average peak demand over the most recent three (3) calendar years; or\n(2) one hundred fifty (150) megawatts.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 7.9. Expedited Generation Resource Plans and Large Load Customers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-7.9-8","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"619a895f9d8f9994135986a57cefc3205f17c3c29b13353836cdf594c4413d0e","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-7.9-7","next":"us-in/ic-8-1-7.9-9"},"notice":"GroundRules: Original legal text. Not legal advice."}
