{"data":{"id":"us-in/ic-8-1-8.7-10","jurisdiction":"us-in","citation":"IC 8-1-8.7-10","heading":"Construction of electric generating facilities; additional certification; joint applications","body":"Sec. 10. (a) This chapter does not relieve a public utility of the duty to obtain a certificate under IC 8-1-8.5 if the utility is proposing the use of clean coal technology as a part of the construction of an electric generating facility.\n(b) A public utility seeking a certificate under IC 8-1-8.5 and this chapter for one (1) project may file a joint application for both certificates. If a joint application is filed, the commission shall jointly consider both certificates.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 8.7. Clean Coal Technology"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-8.7-10","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"599b212834e2803014d438a891b492231967df3cd38dfe85b7879568ee0083e3","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-8.7-9","next":"us-in/ic-8-1-8.8-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
