{"data":{"id":"us-in/ic-8-1-8.8-8.7","jurisdiction":"us-in","citation":"IC 8-1-8.8-8.7","heading":"\"Qualified utility system expenses\"","body":"Sec. 8.7. As used in this chapter, \"qualified utility system expenses\" means the costs associated with the study, analysis, or development of a life cycle management project for a nuclear energy production or generating facility.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 8.8. Utility Generation and Clean Coal Technology"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-8.8-8.7","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"af9e0b038d4f256818883ca9a30439fbc3012958d177c5f9f53819bebd815180","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-8.8-8.5","next":"us-in/ic-8-1-8.8-9"},"notice":"GroundRules: Original legal text. Not legal advice."}
