{"data":{"id":"us-in/ic-8-1-8.9-11","jurisdiction":"us-in","citation":"IC 8-1-8.9-11","heading":"Qualified order for cost recovery","body":"Sec. 11. (a) Notwithstanding any other law, the commission may, in accordance with this chapter and IC 8-1-2-42.1, issue a qualified order that:\n(1) approves the terms of a qualified contract; and\n(2) authorizes the recovery of qualified costs by an energy utility from its customers.\n(b) A qualified order issued under this section may not be:\n(1) rescinded;\n(2) nullified; or\n(3) modified;\nin such a manner that reduces or otherwise impairs the value of an SNG property interest.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 8.9. Financing of Substitute Natural Gas Costs"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-8.9-11","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"0de7cbe0e6ac37e996a0951c4069c7772869ab0cca599a013899bb6b1eac649a","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-8.9-10","next":"us-in/ic-8-1-8.9-12"},"notice":"GroundRules: Original legal text. Not legal advice."}
