{"data":{"id":"us-in/ic-8-1-8.9-7","jurisdiction":"us-in","citation":"IC 8-1-8.9-7","heading":"\"Qualified order\" defined","body":"Sec. 7. As used in this chapter, \"qualified order\" means a final and irrevocable order that:\n(1) is issued by the commission; and\n(2) approves a qualified contract adopted in accordance with this chapter and IC 8-1-2-42.1.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 1. UTILITIES GENERALLY","Chapter 8.9. Financing of Substitute Natural Gas Costs"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-1-8.9-7","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"c75d0a7b53337525e6cc433a41611a3448f8cd7857ccfa3d489b966a698d52de","source_id":"us-in","stale":false,"prev":"us-in/ic-8-1-8.9-6","next":"us-in/ic-8-1-8.9-8"},"notice":"GroundRules: Original legal text. Not legal advice."}
