{"data":{"id":"us-in/ic-8-23-9-28","jurisdiction":"us-in","citation":"IC 8-23-9-28","heading":"Claims against contractors; retaining amount of claim","body":"Sec. 28. Upon the receipt of a claim under section 26 of this chapter, the department shall retain out of the amount due the contractor the amount of the claim.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9. State Highway Contracts; General Powers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9-28","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"9581bb8a4f4a0af6539b27e41b85d818494f08843808efe0092314b20bf27e49","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9-27","next":"us-in/ic-8-23-9-29"},"notice":"GroundRules: Original legal text. Not legal advice."}
