{"data":{"id":"us-in/ic-8-23-9-39","jurisdiction":"us-in","citation":"IC 8-23-9-39","heading":"Claims against contractors; additional proceedings","body":"Sec. 39. Sections 34 through 38 of this chapter do not limit or abridge the right of a person, firm, limited liability company, or corporation to proceed against a contractor and surety as provided by section 10 of this chapter.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9. State Highway Contracts; General Powers"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9-39","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"e1db57ac3054e158ff1b4ebf9896e01d18049a306a9fbe9aa7bb51da10b05b3a","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9-38","next":"us-in/ic-8-23-9-40"},"notice":"GroundRules: Original legal text. Not legal advice."}
