{"data":{"id":"us-in/ic-8-23-9.5-10","jurisdiction":"us-in","citation":"IC 8-23-9.5-10","heading":"\"PDB\" or \"progressive design-builder\"","body":"Sec. 10. As used in this chapter, \"PDB\" or \"progressive design-builder\" refers to a person that has been awarded a contract by the department in which design services, preconstruction services, and construction services of a project are procured from a person that is selected through a qualifications based selection process at the earliest feasible stage of the project.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9.5. Project Delivery Methods"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9.5-10","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"8af80f1bdacaa373dc8b61891cfb8233a29b564d92f3978aaa3650ea98436187","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9.5-9","next":"us-in/ic-8-23-9.5-11"},"notice":"GroundRules: Original legal text. Not legal advice."}
