{"data":{"id":"us-in/ic-8-23-9.5-20","jurisdiction":"us-in","citation":"IC 8-23-9.5-20","heading":"Replacing subcontractors","body":"Sec. 20. (a) A CMGC or PDB may not replace a person identified as a person with which the CMGC or PDB proposes to enter into a subcontract for services under a contract without:\n(1) the approval of the department; and\n(2) a written determination by the department that a legitimate reason exists for the replacement.\n(b) If a CMGC or a PDB violates subsection (a), the department may cancel the award of or may terminate the contract.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9.5. Project Delivery Methods"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9.5-20","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"4048d5ca5eafb253c777c6cc9a5e20767bbcdfe83bd70e0a46a452f0ccb3d54e","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9.5-19","next":"us-in/ic-8-23-9.5-21"},"notice":"GroundRules: Original legal text. Not legal advice."}
