{"data":{"id":"us-in/ic-8-23-9.5-24","jurisdiction":"us-in","citation":"IC 8-23-9.5-24","heading":"Negotiations with another CMGC or PDB; terminating projects","body":"Sec. 24. The department may proceed to negotiate a contract under this chapter with another CMGC or PDB, or terminate a project if any of the following occur:\n(1) A contract is terminated under section 23 of this chapter.\n(2) The department and the selected CMGC or PDB are unable to reach agreement on a contract.\n(3) The CMGC or PDB selected under section 18 of this chapter does not provide the required bonds as described in the request for proposals.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9.5. Project Delivery Methods"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9.5-24","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"76ef4ba14ae28a7df0ef3743ec4f8425e95c7e5675a89311de0c163511777feb","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9.5-23","next":"us-in/ic-8-23-9.5-25"},"notice":"GroundRules: Original legal text. Not legal advice."}
