{"data":{"id":"us-in/ic-8-23-9.5-8","jurisdiction":"us-in","citation":"IC 8-23-9.5-8","heading":"\"Preconstruction services\"","body":"Sec. 8. As used in this chapter, \"preconstruction services\" means consulting to provide information regarding the impact of design on the construction services of a project, including:\n(1) scheduling;\n(2) work sequencing;\n(3) cost engineering;\n(4) constructability;\n(5) cost estimates; and\n(6) risk identification.","path":["TITLE 8. UTILITIES AND TRANSPORTATION","ARTICLE 23. INDIANA DEPARTMENT OF TRANSPORTATION","Chapter 9.5. Project Delivery Methods"],"source_url":"https://iga.in.gov/ic/2026/Title_8.html#8-23-9.5-8","current_through":"2026","vintage":"2026","retrieved_at":"2026-10-04T20:08:46Z","sha256":"85a4f87bf6015ac7669bdf58a94e3b53dab024c807a4b9f954f0d41e0bce002f","source_id":"us-in","stale":false,"prev":"us-in/ic-8-23-9.5-7","next":"us-in/ic-8-23-9.5-9"},"notice":"GroundRules: Original legal text. Not legal advice."}