{"data":{"id":"us-ky/krs-176.100","jurisdiction":"us-ky","citation":"KRS 176.100","heading":"Deviation from contract.","body":"No contractor shall deviate from the provisions, plans or specifications upon which a\ncontract has been awarded without first having obtained written authority from the\ndepartment to do so. If the contractor does deviate without such authority, neither the\nState of Kentucky, the Department of Highways, the Finance and Administration Cabinet\nnor the State Treasurer shall pay or be liable for any work or material not fully provided\nfor in the original contract.","path":["KRS Chapter 176"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=5175","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:51:27Z","sha256":"bbafea38be42e431d9ab576ff08e646faac7fb9f5e0b6200b28f0c86ad264439","source_id":"us-ky","stale":false,"prev":"us-ky/krs-176.095","next":"us-ky/krs-176.110"},"notice":"GroundRules: Original legal text. Not legal advice."}
