{"data":{"id":"us-ky/krs-179.230","jurisdiction":"us-ky","citation":"KRS 179.230","heading":"When removal to be made -- Notice of requirements to be published.","body":"(1) The brush, bushes, weeds, overhanging limbs of trees and all other obstructions\nalong the roads shall be removed between July 1 and August 20 of each year, and\nthe county engineer shall publish in some county paper for at least two (2)\nconsecutive weeks be fore July 1 of every year, in the manner provided in KRS\nChapter 424, the requirements of KRS 179.220 and of this section and the order of\nthe fiscal court.\n(2) The cost of the publication required by subsection (1) of this section shall be paid\nby the fiscal court of the county in which the notices were published and posted.","path":["KRS Chapter 179"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=5494","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:51:31Z","sha256":"0f86836648d03c5a763bb479c137cddb62034143e928e1076205b846a2b12533","source_id":"us-ky","stale":false,"prev":"us-ky/krs-179.220","next":"us-ky/krs-179.240"},"notice":"GroundRules: Original legal text. Not legal advice."}
