{"data":{"id":"us-ky/krs-179.260","jurisdiction":"us-ky","citation":"KRS 179.260","heading":"Pipelines not to obstruct roads.","body":"Pipeline companies whose lines have been laid across or along any public road shall fill\nup all excavations made by them and shall make the public road in all respects as good as\nit was before the excavation was made, and keep it in such condition.","path":["KRS Chapter 179"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=5497","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:51:31Z","sha256":"e61b6354878a0dc96bf635848cd80acd2a5d68f466c8f47918f46f7877a89980","source_id":"us-ky","stale":false,"prev":"us-ky/krs-179.250","next":"us-ky/krs-179.265"},"notice":"GroundRules: Original legal text. Not legal advice."}
